Lendus.

Voltage Optimisation Unit Finance

Spread the cost of a voltage optimisation unit from £5,000 to £60,000 with flexible finance options. HP, lease, or refinance, compare rates from 40+ lenders.

Can you finance a voltage optimisation unit?

Yes, voltage optimisation units are financed as a standard asset purchase, usually on hire purchase or a lease, with the machine itself acting as the security. UK prices typically run £5,000 to £60,000, and most deals are written over 24–60 months with a deposit of around 10–20%. Decisions typically take 24–48 hours. Used machines are financeable too, usually with a shorter term.

200+ UK lenders
2-minute application
No credit check to apply
FCA-regulated brokers

Typical Cost

£5k – £60k

Approval Speed

24–48 hours

Same-day for < £15k

Rates From

6.5% APR

What would a voltage optimisation unit cost per month?

£20,000
10%
60 months
9%
£0

Your estimate

Indicative only. Not a quote and not an offer of finance.

Pre-filled with a typical voltage optimisation unit price. Indicative only, not a quote.

Compare voltage optimisation unit finance rates from 200+ lenders

Check Eligibility

Finance options

Hire Purchase (HP)

Rate
From 7.0% APR
Term
24–60 months
Deposit
10–20%
Ownership
Yours at the end
Best for
Businesses wanting to own the unit outright

Finance Lease

Rate
From 6.5% APR
Term
24–60 months
Deposit
None required
Ownership
Return or buy (balloon payment)
Best for
Keeping capital free for other site improvements

Operating Lease

Rate
From 7.8% APR
Term
36–60 months
Deposit
None required
Ownership
Return at end
Best for
Landlords who don't want a fixed electrical asset on the balance sheet

Representative example

On a purchase price of £20,000: a 10% deposit of £2,000, then 48 monthly payments of £422 at 5.9% APR representative (fixed). Total amount payable £22,256, including the deposit. The rate you are offered depends on your business and the asset.

What buyers actually specify

Guide prices for sizing a finance agreement, not quotes. Manufacturers in this market mostly price on application, so where a current UK list price could not be confirmed the row describes a specification class rather than naming a model. Your supplier quote is what the agreement is written against.

Machine or specification Guide price Type
Single-phase voltage optimisation unit for a small commercial unit (specification class) £5,000 – £10,000 Single-Phase VO Unit
Three-phase voltage optimisation unit for an office or light industrial site £12,000 – £25,000 (indicative; UK suppliers include Powerstar, price not independently verified) Three-Phase VO Unit
Larger three-phase unit for a factory or distribution centre (specification class) £25,000 – £45,000 Industrial-Scale VO Unit
Site-wide voltage optimisation for a multi-building campus (specification class) £40,000 – £60,000 Campus-Scale VO System

Ready to compare voltage optimisation unit finance? 2 minutes, no credit check.

Check Eligibility

Tax benefits

A voltage optimisation unit is wired directly into a building's incoming electrical supply, which means it's often treated as a fixture rather than free-standing plant for capital allowances purposes, similar to a heat pump or EV charge point installed the same way. This can affect both the allowances available and whether an asset lender is comfortable lending against the unit on its own, since it's not something that can be easily unplugged and moved elsewhere. Confirm the correct tax treatment with your accountant based on how the unit is actually installed at your site.

Market context

Voltage optimisation units are bought by businesses on sites where the incoming electricity supply runs consistently above the standard nominal voltage, common in parts of the UK network, and by landlords and facilities managers looking to reduce equipment strain and extend the working life of motors, lighting and other electrical plant across a site. Because the unit is wired into the main incoming supply, most buyers finance it as part of a wider electrical or energy efficiency project rather than as a standalone item, and installation needs a qualified electrician working alongside the finance process. Replacement is generally driven by a site's electrical load changing significantly, such as a major refit or expansion, rather than the unit itself wearing out, since these units have no moving parts and typically have a long working life.

Bad credit?

Several of our 200+ lenders specialise in businesses with imperfect credit histories. You may need a larger deposit or personal guarantee, but options exist. Checking your options here does not affect your credit score, because we do not run a credit search to match you. A lender will run their own checks only if you decide to apply.

Compare rates from 200+ lenders, takes 2 minutes.

Check Eligibility

Frequently asked questions

How do I know if my site would benefit from voltage optimisation?
A qualified electrician or energy consultant can check your incoming supply voltage against the nominal UK standard using a simple monitoring exercise over a few days, which will show whether your site is running consistently above the level your equipment is designed for. This assessment is separate from the finance process but is worth doing before committing to a unit size, since it determines the right specification for your site.
Is a voltage optimisation unit treated as a fixture for tax purposes?
Generally yes, since it's wired directly into the building's incoming electrical supply rather than being a portable, free-standing item. This affects the capital allowances treatment and can influence how comfortable a lender is financing the unit on its own rather than as part of a wider electrical works package. Check the specific treatment with your accountant.
Can installation and electrical work be included in the finance?
Yes, most lenders will include the qualified electrical installation work shown on the supplier's invoice alongside the unit itself, which is the normal way this equipment is financed given that professional installation is a legal requirement for connecting into a building's main supply.
What deposit is typical for this equipment?
Hire purchase deposits typically run 10% to 20%. A larger deposit will reduce the monthly payment, and landlords or facilities managers financing a unit as part of a wider site improvement programme sometimes negotiate a lower deposit against an established portfolio track record.

Related equipment finance

More energy & sustainability finance

See how lenders treat energy & sustainability assets

Guides and resources

Ready to finance your voltage optimisation unit?

Compare rates from 200+ lenders. No credit check.

Check Eligibility →
Check Eligibility, 2 min, no credit check